Plan the cabling before the drywall goes up
A data drop costs a fraction while the studs are open. Here is what to lock in before framing inspection, room by room.
DDSFloorStack · October 8, 2026 · 6 min readThe most expensive cable in a dental office is the one added after the walls close. Fishing a line through finished drywall means patching, painting and working around a schedule full of patients. Planning it on paper first costs nothing.
Lock these before framing inspection
- One data drop per workstation, plus one spare per operatory
- A drop behind every patient TV location, even if it starts on HDMI
- Ceiling drops for each camera and Wi-Fi access point
- Wired drops for pano, CBCT, 3D printers and mills
- A dedicated 20 A circuit at the rack location
Pick the rack room early
Every cable home-runs to one place. It needs ventilation, a lock and distance from the compressor and vacuum. Mechanical rooms run hot, so confirm the heat load before you commit.
Cat6 runs should stay under 295 ft from the rack. A central MDF keeps every drop inside that limit without a second closet.
Hand your contractor a plan they can read
A floor plan with every drop labeled, a device schedule and a rack elevation removes guesswork from the low-voltage bid. That is exactly what the Studio plan produces.