Opening a new office? Lay out every drop, camera and screen before the walls close.
Technology is the cheapest thing to plan and the most expensive thing to fix after drywall. Studio turns a floor plan into a device-by-device map your contractor can price.
What we plan with you
- Workstation, data drop and TV locations for every operatory
- Camera and Wi-Fi placement drawn against your real walls
- Rack room size, power and cooling
- Server or cloud, based on your practice software
- Internet order timing and backup line
Your timeline
1Lease signedShare the plan with your architect so the rack room and conduit are drawn in.
2Drawings in progressThe ideal moment. Lock drop and camera locations before framing.
3Walls openHand the schedule to your low-voltage contractor to rough in all cabling.
4Weeks before openingRack, network and devices go live and get tested with your software.
Fiber installs can take 30 to 60 days. Order internet as soon as the lease is signed.